Time to read: 2 minutes(s)

More than 500 million rubles may have been stolen from the Ministry of Defense during the construction of a water pipeline from Rostov to the "DPR."

The criminal case involves employees of the southern branch of the Military Construction Company and contractors. Investigators allege that they inflated the cost of work and materials.

In particular, as Kommersant has learned, investigators have filed motions with Moscow's Khamovnichesky Court to extend the pre-trial detention of the company's former chief engineer. To Nikolai Laptev, to the CEO of PP Interarm Vladimir Kuranov, to his deputy Vilena Dallari, As well as employees of NEST LLC. None of them admit guilt.

A criminal case for the embezzlement of funds from the Ministry of Defense was opened in October 2025. It concerns events related to the construction of a water supply system. Don-Donbass.

Before the start of the "SVO", Donbass consumed water from a canal leading from Seversky Donets, which was blocked due to the war with Ukraine. In 2022, construction began on a new canal, which was supposed to connect the so-called "new region" and the river. Don. The project was supervised by the then Deputy Minister of Defense Timur Ivanov.

In 2023, officials claimed that after the launch of the water pipeline, which will take away from residents Rostov region With 300 cubic meters per day, Rostov residents won't face any new drinking water problems. However, they already exist—NeMoskva reported on regular water outages in Rostov.

However, the water pipeline never reached full capacity—technical flaws were found. In 2025, serious problems with the "DPR" water supply became known. Local authorities in the region claimed that the Don-Donbass water pipeline supplied only a third of the "new region."