"Everything's already been destroyed!" A construction waste processing facility in the Moscow region has been replaced by yet another landfill.

В Lytkarino Mountains of garbage have grown on former collective farm fields. According to documents, Ecological Technologies LLC deal recycling waste on their property, essentially storing and compacting it. The process was captured by television journalists.
Trucks loaded with waste enter the landfill one after another, and on private property, it is compacted by excavators.
The owner's website states: "Our sites are equipped in accordance with all standards and requirements for processing virtually any type of waste."
Locals insist that the environment has been damaged:
“The water in the local stream was red and green,” “The water in the well tasted like oil,” told Lytkaryntsy.
The waste disposal business, organized in the water protection zone and the protection zone of the Church of the Nativity of the Virgin Mary, has been going on for more than 4 years.
Deputy Head of the Lytkarino Urban District Vladimir Sharov reported to the film crew: officials contacted all supervisory authorities, who promised to conduct an investigation.
“Everything is already destroyed!” “Was it really impossible to build an ecological waste processing plant in 25 years, like they do abroad?” — residents were outraged in the comments.
Let us recall that earlier, at one of the waste disposal sites the Yug training ground in Myachkovo formed A deep hole. Residents raised the alarm about the increasing stench, but no one answered them as to what had happened.
Photo: screenshots from the video "Vesti. Moscow Region"
